ardiss 发表于 2008-9-10 00:50:27

模拟临时交通管理措施的利益S-Paramics

Roadworks : What are the benefits of modelling temporary traffic management arrangements ?, by Stephen Cragg SIAS. Scottish Transport Applications and Research (STAR) Conference April 2007
Stephen Cragg, 道路施工:模拟临时交通管理措施的利益?苏格兰交通应用与研究会议(STAR),2007
http://www.sias.com/ng/articles/pdfs/STAR2007Cragg.pdf

本文分析了对临时交通管理措施进行模拟给路网运营带来的利益,并讨论了在道路施工前给道路使用者应该提供的信息。
案例包括:1)通过对苏格兰爱丁堡间M8高速公路重大施工进行模拟来表明给主干路带来的利益;2)通过对爱丁堡市中心区煤气主管道更新工程进行模拟来表明给城市路网带来的利益。
This paper demonstrates the operational benefits that can be accrued from modelling the temporary traffic management arrangements to assist optimum design, and goes on to discuss what information should be provided to road users in advance of the works commencing.
The use of modelling will be illustrated with results from two case studies: M8 major roadworks to illustrate the benefits for trunk road situations; Gas Mains Renewal in central Edinburgh to illustrate the benefits in urban situations.
页: [1]
查看完整版本: 模拟临时交通管理措施的利益S-Paramics